Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Planning commission approves rezonings, plats and vacations for Meadows Second Addition

February 21, 2025 | Kearney City, Buffalo County, Nebraska


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Planning commission approves rezonings, plats and vacations for Meadows Second Addition
The Kearney City Planning Commission on Monday approved a package of actions to allow the Meadows Second Addition, a proposed residential subdivision north of 40 First Street and east of Avenue X.

Applicant representative Nate Jensen said the development’s final plat contains 66 lots and two outlots and will reconfigure portions of the previously platted Meadows First Addition to create new east–west connections through 40 First Street and 40 Third Street. “The existing water will be fed from the 16‑inch main here on 30 Ninth Street,” Jensen said, and sanitary service will be provided by an 18‑inch sanitary trunk on 30 Ninth Street with smaller mains tying into the new streets. He added stormwater from parts of the site will outlet to an existing detention pond on the northeast side of the property.

City planning staff recommended approval. Melissa (city planning staff) told commissioners the proposed rezonings are compatible with surrounding development, the lots meet the R‑1D standards for width, public utilities can adequately serve the development, and the annexation aligns with the city’s annexation policy and the city’s February 2016 comprehensive plan. Staff reported there had been no citizen calls about the request.

Commissioners approved three non‑hearing items — an easement vacation (2025‑01), a street vacation (2025‑02) and a subdivision vacation (2023‑07) — in one bundled motion. They then approved rezoning 2025‑02 (AG to R‑1D), rezoning 2025‑03 (R‑2 PD to R‑3), preliminary plat 2025‑02, final plat 2025‑02 and annexation 2025‑01, all based on staff’s findings of fact. The record shows the motions carried with the commissioners present voting in favor.

Key technical details presented by the applicant and staff included:
- Final plat: 66 residential lots and 2 outlots; replatting of portions of the Meadows First Addition to reconfigure easements, streets and lot lines.
- Water: connection to an existing 16‑inch water main on 30 Ninth Street with internal 8‑inch loops along the new streets.
- Sanitary: tie‑in to an 18‑inch sanitary trunk on 30 Ninth Street feeding 8‑inch mains along local streets and a 12‑inch main on Avenue X.
- Stormwater: parts of the development will flow to the existing detention pond at the site’s northeast corner via flared end sections.

No formal public comments were recorded during the hearings on the Meadows Second Addition. Commissioners repeatedly referenced the city staff findings in making their motions.

Next steps: With the annexation, plat approvals and rezonings approved by the planning commission, the applicant may proceed with final engineering and permitting steps required by the city before building permits are issued. Specific timelines and permit conditions were not specified during the meeting.

View full meeting

This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.

View full meeting

Sponsors

Proudly supported by sponsors who keep Nebraska articles free in 2025

Scribe from Workplace AI
Scribe from Workplace AI