Board approves addition at 11 Cresthill Ave. with conditions requiring no finished attic and built-in driveway protection

5053352 · June 4, 2025

Get AI-powered insights, summaries, and transcripts

Subscribe
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Zoning Board approved Yehuda Amin’s application for an addition at 11 Cresthill Ave., granting side-yard and combined side-yard variances with conditions that attic space remain unfinished for storage/mechanicals and that bollards or reinforced wall be built at the driveway front.

The Clifton Zoning Board of Adjustment voted June 4 to approve an application to expand a house at 11 Cresthill Ave., granting bulk variances for side-yard setbacks and combined side yards and attaching conditions intended to limit future habitability of the attic and to protect adjacent property from driveway encroachments.

Attorney Dominic Iannarello and applicant representative (Ira / architect) presented a revised plan, produced after consultation with the zoning office, that reduced the roof height to meet the 30-foot maximum and included doghouse-style dormers to add storage and mechanical space. The applicant told the board the upstairs area would be unfinished and used for mechanicals and storage only; the board included a condition that the attic not be walled or finished to create additional living space. The board also required reinforced construction or built-in bollards at the front of the driveway to prevent vehicles from encroaching on the façade or neighboring properties.

Commissioner Braid moved approval with the stipulation that bollards (built into the front wall) be provided and that attic space remain unfinished; Commissioner O'Connor seconded. The motion passed 7–0 on roll call.