Limited Time Offer. Become a Founder Member Now!

Commission gives guidance on ADU size for undersized lots after Joseph Whelan pre‑application

April 12, 2025 | Town of Greenwich, Fairfield, Connecticut


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Commission gives guidance on ADU size for undersized lots after Joseph Whelan pre‑application
Joseph Whelan and his son Chris sought guidance April 8 on options to add living space at a family property on 4 High Street. Commissioners and staff walked through accessory dwelling unit (ADU) rules, setback constraints and practical design options for an undersized lot.

Staff and commissioners summarized the commission’s interpretation: on undersized lots the safe reading is that detached ADUs are limited to 600 square feet total unless the applicant secures a special permit or variance; in the R‑6, R‑7 and R‑12 zones regulations allow up to 800 square feet for detached ADUs on conforming lots but the undersized‑lot restriction constrains this in practice. Commissioners noted the distinction between accessory‑structure sizing (which can require ZBA review or special permit when exceptions are sought) and the absolute unit‑size ceiling in the ADU regulation.

Commissioners and staff outlined alternative paths: (1) a detached accessory building with a garage on the ground floor and a smaller (600‑square‑foot) ADU above, with a parking space allocated to the ADU; (2) convert the primary residence to a two‑family dwelling (subject to FAR and building code limits) if the owner is willing to make the house a two‑family; or (3) pursue a variance from the Zoning Board of Appeals if needed for rear‑setback relief or to increase detached‑structure footprint. The commission also noted that because the existing lot has an encroaching rear setback and significant topography, relief from the ZBA could be required before a larger detached structure can be built.

Staff offered to meet with the Whelans and help evaluate FAR, setbacks and whether an attached addition or a reconfigured detached accessory building is the practical path forward. No formal application was decided — commissioners provided procedural guidance and recommended the applicants consult staff to scope the most feasible design route.

View full meeting

This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.

View full meeting

Sponsors

Proudly supported by sponsors who keep Connecticut articles free in 2025

Scribe from Workplace AI
Scribe from Workplace AI