Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Board authorizes utility permits for Eastern Iowa Light and Power for line work in Spring Rock and Brookfield townships


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Board authorizes utility permits for Eastern Iowa Light and Power for line work in Spring Rock and Brookfield townships
The Clinton County Board of Supervisors on Sept. 22 authorized two utility permits for Eastern Iowa Light and Power (REC).

Utility Permit No. 9-69 covers work to bore a new line beneath 110th Avenue and retire existing overhead lines in Section 31, Township 81 North, Range 01 East (Spring Rock Township). Utility Permit No. 9-70 covers placing a new overhead line and wooden utility poles in the county right-of-way along 200th Avenue in Section 10, Township 83 North, Range 02 East (Brookfield Township).

Both permits are described in the packet as work located within county right-of-way and require the chairperson’s authorization to sign the permit. The packet identifies the utility as Eastern Iowa Light and Power and includes the REC parenthetical; no construction schedule, engineering plans, or explicit bonding/insurance details are included in the excerpt provided.

View the Full Meeting & All Its Details

This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.

Watch full, unedited meeting videos
Search every word spoken in unlimited transcripts
AI summaries & real-time alerts (all government levels)
Permanent access to expanding government content
Access Full Meeting

30-day money-back guarantee