City Council approves full replacement of Fifth Street waterline using TWDB funds

July 08, 2025 | Bay City, Matagorda County, Texas

Thanks to Scribe from Workplace AI , all articles about Texas are free for you to enjoy throughout 2025!


City Council approves full replacement of Fifth Street waterline using TWDB funds

This article was created by AI using a video recording of the meeting. It summarizes the key points discussed, but for full details and context, please refer to the video of the full meeting. Link to Full Meeting

The Bay City Council Workshop held on July 8, 2025, focused on the critical assessment and proposed replacement of the Fifth Street waterline. The meeting highlighted the deteriorating condition of the existing 12-inch ductile iron pipeline, which has suffered significant structural damage, prompting the need for urgent action.

City staff, in collaboration with Garber and Herb, presented findings from a recent leak detection assessment conducted by Hydramax. The analysis revealed that over 80% of the waterline has lost more than 25% of its original wall thickness, indicating severe deterioration. This situation has led to a documented history of failures, making the waterline a prime candidate for replacement under the Texas Water Development Board's (TWDB) 2023 funding program.

The council discussed the financial aspects of the project, noting that approximately $4.3 million remains available from the TWDB funding, which totals $12 million for the Fifth Street waterline project. The recommendation is to fully replace the waterline rather than pursue piecemeal repairs, which would ultimately be more cost-effective and reliable in the long term. The estimated cost for complete replacement is approximately $2.28 million, while partial repairs would be around $1.9 million.

Construction is expected to take about 300 days, with plans to maintain water service during the replacement process. The council emphasized the importance of this project in reducing future maintenance costs and improving the reliability of the water supply in the area.

In conclusion, the council is set to approve the engineering design services for the full replacement of the Fifth Street waterline, which is seen as a necessary step to address aging infrastructure and ensure long-term service reliability for Bay City residents.

Converted from Bay City - City Council Workshop - Jul 08, 2025 meeting on July 08, 2025
Link to Full Meeting

Comments

    View full meeting

    This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.

    View full meeting

    Sponsors

    Proudly supported by sponsors who keep Texas articles free in 2025

    Scribe from Workplace AI
    Scribe from Workplace AI