Limited Time Offer. Become a Founder Member Now!

Developers unveil landscaping and stormwater management plans for new campus project

April 14, 2025 | State College City, Centre County, Pennsylvania


This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the video of the full meeting. Please report any errors so we can fix them. Report an error »

Developers unveil landscaping and stormwater management plans for new campus project
The State College Borough Council meeting on April 14, 2025, highlighted significant developments in local infrastructure and community planning, particularly focusing on a new project that aims to enhance transportation and manage stormwater effectively.

One of the key discussions centered around the landscaping and structural improvements along the eastern property line of a new development. Council members reviewed plans for a landscape buffer that will include a mix of deciduous and evergreen trees, as well as shrubs. This buffer is designed to provide a natural barrier between the new construction and neighboring properties, promoting both privacy and aesthetic appeal. Additionally, a six-foot high wall will be installed behind the landscaping to further enhance this separation.

Transportation improvements were also a major focus, particularly in collaboration with the Centre Area Transportation Authority (CATA). The proposed development will feature a dedicated bus pad, allowing for better access to public transportation for residents and visitors. This area is strategically located to facilitate bus routes coming from the campus and surrounding areas, addressing previous concerns about bus circulation and service efficiency.

Stormwater management was another critical topic, as the area has historically faced flooding issues. The council discussed plans for an underground stormwater facility, a rain garden, and additional stormwater basins to ensure that water is effectively managed and treated. These measures are expected to significantly improve the current situation, which lacks adequate stormwater management.

The meeting also touched on the future connection of Plaza Drive through the shopping center site, with assurances that no buildings will be constructed in designated no-build areas to accommodate this potential roadway. This connection aims to enhance traffic flow and accessibility in the area.

Overall, the discussions during the meeting reflect the council's commitment to improving community infrastructure while addressing environmental concerns. The proposed developments are set to enhance the quality of life for residents by providing better transportation options and managing stormwater more effectively. As these plans move forward, the council will continue to engage with community members and stakeholders to ensure that local needs are met.

View full meeting

This article is based on a recent meeting—watch the full video and explore the complete transcript for deeper insights into the discussion.

View full meeting