During a recent government meeting, officials discussed critical infrastructure issues, particularly focusing on road rehabilitation and maintenance strategies. The conversation highlighted the importance of addressing base failures, which are a primary cause of road deterioration. Officials emphasized that effective rehabilitation requires removing the damaged base and replacing it with new material to ensure long-lasting repairs.
The meeting also covered the use of milling equipment, specifically an asphalt zipper, which is essential for full road reconstruction. However, the current heavy equipment available is limited, making it challenging to perform efficient mill and fill operations. Officials expressed a desire to acquire a smaller milling machine that could be attached to existing loaders, allowing for more flexible repairs, especially at problematic intersections.
The discussion included the significance of maintaining a solid sub-base for roads. If the sub-base is compromised, it can lead to further issues, such as potholes. Officials noted that water infiltration over time can weaken the base, necessitating more extensive repairs. They outlined the process of milling, which involves reusing existing materials when the sub-base is adequate, thereby reducing costs and waste.
Budget considerations were also a key topic, with officials indicating that the acquisition of new equipment, including a loader and potentially a milling machine, would need to be included in future capital asset budgets. They acknowledged the importance of planning for these expenditures in the upcoming fiscal year to enhance the city's road maintenance capabilities.
Overall, the meeting underscored the ongoing challenges in maintaining the city's road infrastructure and the need for strategic planning and investment in equipment to improve repair processes.